Zone 04 · West Coast
One highway to Tofino and Ucluelet. We plan around it.
Freight for the west coast crosses to Duke Point and takes Highway 4 through Port Alberni and over the mountains: about 195 km to Ucluelet and 220 km to Tofino. When the Cameron Lake section closes, as it did for 17 days in 2023, the coast waits or the freight takes forest roads. Bamfield is at the end of 76 km of industrial road, or a scheduled freight vessel from Port Alberni.
The request opens with the West Coast as the destination.
The way in
How freight reaches the west coast
We send it by commercial barge to Duke Point, north on Highway 19 past Parksville, then west on Highway 4: past Cameron Lake to Port Alberni, through Sutton Pass and down past Kennedy Lake to the Tofino–Ucluelet junction. Bamfield is reached from Port Alberni on Bamfield Main, about 76 km of industrial road.
Source: BC Government (Highway 4 and Bamfield Main releases, 2011–2025); OSRM on OpenStreetMap.
- 01Port pickupOne of the five Vancouver-area port facilities, inside the terminal's reservation window.
- 02The crossingTilbury or Surrey to Duke Point on the commercial barge, a daily, scheduled service. The trailer crosses without a tractor.
- 03Highway 4From Highway 19 near Qualicum Beach, past Cameron Lake to Port Alberni, about 100 km from Duke Point; then Sutton Pass and Kennedy Lake to the coast.
- 04The last legUcluelet about 195 km from Duke Point, Tofino about 220 km. Bamfield about 185 km, the last stretch on Bamfield Main.
- 05ReceiverDelivered to the appointment; the equipment goes back on a return sailing.
Road distances from Duke Point
| Community | From Duke Point |
|---|---|
| Ucluelet | 195 km |
| Tofino | 220 km |
| Bamfield | 185 km |
Road distances: OSRM routing on OpenStreetMap data (© OpenStreetMap contributors), terminal to town centre, computed 2026-10-05 and rounded to the nearest 5 km. A truck's route can differ.
What is different about west coast deliveries
One highway, past Cameron Lake
Highway 4 at Cameron Lake is the highway into Port Alberni and the only one to Tofino and Ucluelet. In June 2023 a wildfire on the Cameron Bluffs closed it for 17 days; the province ran four piloted convoys a day for commercial vehicles on a forest-road detour through Bamfield and Lake Cowichan that added about four hours, and lane restrictions ran until August 31. Planned daytime closures followed in June 2025, December 2025 and February 2026.
Source: BC Government news releases, June 6 to August 31, 2023, June and December 2025; District of Tofino, February 2026.
Kennedy Hill is rebuilt
The 1.5 km Kennedy Hill section beside Kennedy Lake, about 14 km from the Tofino–Ucluelet junction, was finished in spring 2023: two full lanes, a gentler grade than the old 12%, and the overhanging rock that was a hazard to larger transport vehicles cut away.
Source: BC Ministry of Transportation, Highway 4 Kennedy Hill project.
Wide loads stop at Cameron Lake
Under BC's general permit conditions no load wider than 3.2 m may use Highway 4 between Cathedral Grove and Koen Road, and Category B and C loads may use it only between 9 p.m. and 5 a.m. West of the Taylor River Bridge, 40 km past Port Alberni, any load over 3.2 m wide also needs a pilot car to Tofino.
Source: BC CVSE1000 general permit conditions (April 2026).
Bamfield: by logging road or by boat
Bamfield Main was chip-sealed in 2023 but is still an active logging road. The Mount Underwood wildfire closed it from August 2025 until October 24, and gates at kilometres 8 and 9.5, either side of the fire-damaged slope, can close it in high wind or heavy rain. Lady Rose Marine Services' MV Frances Barkley also sails from Port Alberni to Bamfield on Tuesdays, Thursdays and Saturdays, with room for up to 100 tons of cargo.
Source: Ha-Shilth-Sa (October 2023); Huu-ay-aht First Nations (2026); BC Government news releases, August to October 2025; Lady Rose Marine Services.

What we handle on the west coast
- Vancouver Island FreightMainland to Tofino, Ucluelet and Bamfield, with the crossing and Highway 4 in one plan.
- Specialized FreightOversize freight for the coast, planned around the Highway 4 permit conditions.
- Freight Consolidation & TransloadingContainer to flat deck, step deck or pup when the receiver at the end of Highway 4 cannot take a chassis.
- Delivery & Consignee CoordinationReceiving appointments on the coast, booked around a drive of about 200 km from the terminal.
How we work, wherever the receiver is
Built around you.
We start with how the shipment needs to arrive.
Early is on time.
Receiving appointments are not suggestions.
Find the practical way.
When freight gets complicated, experience takes over.
Watch the total cost.
We look for smarter ways to move freight, not another line item.
FAQ
West Coast freight, answered
How does freight get to Tofino and Ucluelet?
What happens if Highway 4 closes?
Can you deliver to Bamfield?
Other Island zones
Sources
- Seaspan Ferries, drop-trailer service
- BC Government news release, Highway 4 closed at Cameron Lake (June 6, 2023)
- BC Government news release, Highway 4 detour via Bamfield and Lake Cowichan (June 8, 2023)
- BC Government news release, piloted commercial convoys on the Highway 4 detour (June 10, 2023)
- BC Government news release, Highway 4 reopens to single-lane traffic (June 23, 2023)
- BC Government news release, Highway 4 reopens both lanes (August 31, 2023)
- BC Government news release, planned Highway 4 closure at Cameron Lake (June 5, 2025)
- BC Government news release, planned Highway 4 closure at Cameron Lake (December 15, 2025)
- BC Government news release, Highway 4 Sutton Pass (November 3, 2011)
- District of Tofino, Highway 4 full closure notice (February 2026)
- BC Ministry of Transportation, Highway 4 Kennedy Hill project
- BC CVSE1000, general permit conditions for oversize loads (April 2026)
- Ha-Shilth-Sa, Bamfield Main chip-sealing (October 10, 2023)
- Huu-ay-aht First Nations, Bamfield Main
- BC Government news release, Bamfield Main closure and the Youbou detour (August 23, 2025)
- BC Government news release, Bamfield Main reopens (October 24, 2025)
- Lady Rose Marine Services, MV Frances Barkley
- OpenStreetMap contributors, road network (ODbL), routed with OSRM
Get a rate
Have freight to move?
Going to Tofino, Ucluelet or Bamfield? Tell us where the receiver is, when they can take it and what you are sending.
admin@kattzlogistics.com · Nanaimo, Vancouver Island